TERMS AND CONDITIONS
1. This is not a contract work
2.
This is supervision work at 10% of total
cost (this includes site supervising charge, remuneration to supervising
employee appointed by this firm and conveyance charge)
3. Supervision charges must be paid in 5 stages
Stage
1 foundations basement
Stage
2 lintel heights
Stage
3 Main slab
Stage
4 plastering
Stage
5 finishing
4. Changes
or modifications, additions and any kind of changes will not be allowed on the
designed plan without the permission of the consulting engineer of this firm.
In the event of any change approved by the consulting engineer, the required
charges will have to be paid by the owner
5. The responsibility of carrying
and supplying building materials in accordance with the requirements of
constructions is with the owner of the building.
6. There should be proper supply
of electric current for the construction of the building at the site.
7. The owner should pay the
remuneration to the workers in time and they should be brought to the site and
the owner should see that they work to the satisfaction of consulting engineer.
8. Required quantity of water
for construction work should be supplied at the site by the owner
9. Accommodation facility must
be arranged by owner for labourers if needed.
10. If there is any increase in
the estimated cost of materials, owner shall pay such amount also.
11. This firm has only the
responsibility of supervision and as
such any delay, fault or excess expenditure or loss caused due to other factors
do not come under the responsibility of the firm and the owner shall be fully
responsible for all such factors.
12. The owner should pay
supervision charges as and when demanded by the firm and this firm will not be
responsible for any delay or stopping of the work and supervision, in the event
of any financial or other problems on the part of the owner.
13. In the event of stopping of
work due to any fault or negligence on the part of the owner, the full amount of
the supervision charge should be paid by the owner before the time stipulated by
this firm.
14. The jurisdiction will be Harippad